Landscape architects produce concept plans, planting schedules, grading and drainage drawings, and management reports that go to councils, developers and builders. Before you submit a package, save the exact set you’re sending and timestamp it. A TimeBind shows that those exact files existed no later than the recorded time and still match their fingerprints. It doesn’t show that the design is compliant, that you created it or that a council has accepted it. This is general information, not legal advice.
Click here to start: your first TimeBind is free →
Free plan, no credit card needed. Your file stays on your device. More for architects: architecture timestamping guides.
Table of Contents
Why landscape work needs dated records
Landscape designs are often shared early, at pre-lodgement meetings, in developer feasibility work and in tender packs. They change as planning conditions, drainage requirements and species availability change. When a council condition, a plant substitution or a disagreement about the design intent arises later, the question is often which version was submitted and approved. A dated record of each submitted set answers it.
What to record at each stage
| Stage | Files to keep |
|---|---|
| Concept | Site analysis, concept plan, mood boards, the brief |
| Pre-lodgement | The plan shown at the meeting, meeting notes, council feedback |
| Submission | The exact plan set, planting schedule, grading and drainage drawings, any arborist or ecology reports, the lodgement receipt |
| Conditions | The council’s conditions of approval, and your responses |
| Construction | Issued-for-construction set, substitutions approved, site instructions |
| Completion | As-built and maintenance documents |
A routine at each submission
- Freeze the set. Save a copy you won’t change.
- Export the PDFs and keep the native files (CAD, GIS, or planting-schedule spreadsheet).
- Put the key PDFs, the planting schedule and the cover letter in one TimeBind (up to 10 files). See how to timestamp a file.
- Save the Proof of Time Certificate with the lodgement folder.
- Lodge.
- Treat revisions as new sets with their own timestamp.
Your browser makes the fingerprint and the files stay on your device, which suits client plans that aren’t yet public.
Records around substitutions and site changes
Plant availability and site conditions change designs. Keep a dated record of each substitution request, the response and the revised schedule. If a change affects an approved plan, keep the approval. A timestamp of the approved revision shows what existed by a certain date.
Where this fits with other design records
- For planning submissions in general, see planning and DA submission drawings.
- For design competitions, see design competition entry: timestamp before submitting.
- For model files, see timestamp Revit and BIM versions before issue.
- For firms, see timestamping for design and engineering firms.
- For ownership of drawings, see who owns architectural drawings.
Frequently Asked Questions
-
Should I timestamp the plan before the pre-lodgement meeting?
It’s a good time to. Early plans are shared before any formal agreement, and they often change afterwards.
-
Does a timestamp show the plan complies with council rules?
No. It shows that the exact files existed no later than the recorded time. Compliance is for the council and your professional judgement.
-
Can I timestamp a GIS or CAD file?
Yes. Add the file or a zip of the project folder. A TimeBind holds up to 10 files.
-
Does a timestamp show I created the design?
No. It shows when the exact file existed and that it still matches. Your sketches and project records help show how you developed the design.
-
What does a TimeBind cost?
Your first Pooled TimeBind is free, with no credit card required. After that, Pooled TimeBinds start from US$5, and an ASAP TimeBind is US$15. See plans and pricing
Date each submission
Free to start. The files stay on your device and your browser makes the fingerprint.
Last fact-checked: 10 November 2026.
Date the landscape package before you submit it
Add the concept plan, planting schedule and grading drawings (up to 10 files) to one TimeBind before they go to council or the client.
Make your first TimeBind free → See plans and pricing
Your first Pooled TimeBind is free, with no credit card required. After that, TimeBinds start from US$5, and an ASAP TimeBind is US$15. Your browser makes the fingerprint and the file stays on your device. A TimeBind shows a file existed no later than the recorded time. It doesn’t show who made it.







