A measured survey or condition record of a heritage building shows what stood before works began. Fabric may be altered or removed, so the record can become the only evidence of earlier conditions. Before works start, keep your originals (field notes, scans, photos, drawings) and timestamp the set. A TimeBind shows that those exact files existed no later than the recorded time and still match their fingerprints. It doesn’t show that the survey is accurate or that works were or weren’t done as approved. This is general information, not legal advice.

Table of Contents

Why dated records matter on heritage projects

Heritage consent often depends on what existed. Disputes arise when:

  • A contractor removes or alters fabric, and the owner and the authority disagree about its earlier state.
  • An approved scope refers to conditions that were later changed.
  • Insurers or neighbours ask about pre-existing damage.
  • A later researcher needs the original survey and wants to know whether it was changed.

A dated, unchanged record of the survey helps all of these.

What to include in a survey record

  • Field notes and sketches, including your date, the weather, access limits and anything you couldn’t see.
  • Measured drawings: plans, elevations, sections and key details.
  • Photographs, with a written index tying each to a location. Keep the original files.
  • Point-cloud or laser-scan data if used, and a record of the scanner and settings.
  • Condition notes: cracking, moisture, past repairs, fabric type and period if known.
  • The brief and scope, and the approvals or consent conditions.
  • A log of who surveyed what and when.

Steps for a dated survey record

  1. Finish the survey and freeze the originals. Save copies and don’t edit them.
  2. Create a clear folder structure and an index.
  3. Put the key files (the index, the main drawings, a zip of photos, a zip of scan data and the scope) in one TimeBind (up to 10 files). See how to timestamp a file.
  4. Save the Proof of Time Certificate with the survey.
  5. Repeat after works start, at each stage, as separate records.

Your browser makes the fingerprint and the files stay on your device. Large scan files stay on your device too, and you can timestamp a zip.

Pair the record with other records

For site-scan data see prove a CAD model existed before a date and prove an AutoCAD DWG existed before a date. For the build stage, see construction contract timestamping. For condition records of a building, see blockchain property inspection timestamping and timestamp a photo series before publishing. To see how this fits a firm’s practice, see timestamping for design and engineering firms.

What a timestamp doesn’t do

It doesn’t make a survey accurate, satisfy a heritage authority’s requirements or show who damaged fabric. Your professional method, the authority’s rules and the contract do that. Check what your jurisdiction requires for heritage records.

Frequently Asked Questions

  1. Is a timestamp accepted by heritage authorities?

    Requirements vary by authority and jurisdiction. A timestamp is an extra record of when your files existed, not a substitute for required documentation.

  2. Can I timestamp point-cloud data?

    Yes, as a file or a zip. A TimeBind holds up to 10 files.

  3. Should I timestamp the survey before or after works start?

    Before. The value of the record is that it shows the earlier state, so date it before anything changes.

  4. Do I need to timestamp every photo?

    No. Zip them with an index and timestamp the zip, or add key photos individually.

  5. What does a TimeBind cost?

    Your first Pooled TimeBind is free, with no credit card required. After that, Pooled TimeBinds start from US$5, and an ASAP TimeBind is US$15. See plans and pricing

Date the record before the fabric changes

Free to start. The files stay on your device and your browser makes the fingerprint.

Last fact-checked: 10 November 2026.

Date the survey before work starts

Add the measured drawings, condition photos, the survey notes and the scope (up to 10 files) to one TimeBind before works begin.

Make your first TimeBind free → See plans and pricing

Your first Pooled TimeBind is free, with no credit card required. After that, TimeBinds start from US$5, and an ASAP TimeBind is US$15. Your browser makes the fingerprint and the file stays on your device. A TimeBind shows a file existed no later than the recorded time. It doesn’t show who made it.