Consultant coordination: keep a dated record of drawings you receive and issue

Flat illustration of rolled blueprints, a monitor showing an architectural floor plan and a house model

On a project with structural, civil, services, façade and landscape consultants, each discipline draws on the others’ latest information. When something clashes on site, the first question is usually “which drawing were you working from?” Keep a register of what you received from each consultant and what you issued to them, and timestamp the set at key coordination points. A TimeBind shows that those exact files existed no later than the recorded time and still match their fingerprints. It doesn’t show who was responsible for a clash. Your appointments and contract decide that. This is general information, not legal advice.

Click here to start: your first TimeBind is free →
Free plan, no credit card needed. Your file stays on your device. More for architects: architecture timestamping guides.

Table of Contents

Why a coordination record helps

Documents move fast between consultants, and updates cross each other. Common problems:

  • A consultant issued a revision, but the architect’s set was built on the previous one.
  • A clash appears between services and structure and each side says they used the latest drawing.
  • A consultant says a change was never notified.
  • The design team can’t tell which files the contractor priced.

A dated record of received and issued sets makes these questions easier to resolve.

What to keep

  • Each consultant’s issue, exactly as received: drawing set, model, schedule and report.
  • The transmittal or email that carried it, with the date and the sender.
  • Your own issues to consultants and to the contractor, with transmittals.
  • A drawing register that shows each drawing, revision, date received or issued and status.
  • Coordination meeting minutes and clash reports, and the actions agreed.
  • Model federation or clash detection exports, if you use them, with the software version.

A coordination routine

  1. Log every receipt in the register on the day it arrives.
  2. Don’t overwrite an earlier consultant issue. Save each as its own revision.
  3. At each coordination milestone (design development, before tender, issue for construction), zip the current received set and your own issue, and put the zip, the register and the latest transmittal in one TimeBind (up to 10 files). See how to timestamp a file.
  4. Keep the Proof of Time Certificate with the register.
  5. Repeat at the next milestone.

Your browser makes the fingerprint and the files stay on your device, which helps when consultants’ files are confidential.

Where this fits

This record sits between design issues and construction records. See timestamp Revit and BIM versions before issue for model issues, construction contract timestamping for contract records, and document inspection and plan review decisions for review records. For firms, see timestamping for design and engineering firms, and for the wider picture, blockchain construction timestamping.

What a timestamp doesn’t do

It doesn’t show that any drawing is correct, that a consultant received a revision or who should have caught a clash. The transmittals, minutes and contract do that. A timestamp shows that the exact files existed by a certain time.

Frequently Asked Questions

  1. Do I need to timestamp every consultant issue?

    No. Keep the register for every issue, and timestamp at coordination milestones and before big releases such as tender or construction issue.

  2. Can I include consultants’ files in my TimeBind?

    Check your appointment and any confidentiality terms. Your browser makes the fingerprint and the files stay on your device, but the certificate lists file names, so name them neutrally and make sure your agreements allow you to keep copies.

  3. Does a timestamp show a consultant received my drawing?

    No. The transmittal or email shows that. A timestamp shows your exact file existed by a certain time.

  4. How do I handle a very large coordination set?

    Zip the folder and timestamp the zip with the register. A TimeBind holds up to 10 files.

  5. What does a TimeBind cost?

    Your first Pooled TimeBind is free, with no credit card required. After that, Pooled TimeBinds start from US$5, and an ASAP TimeBind is US$15. See plans and pricing

Know which set everyone was working from

Free to start. The files stay on your device and your browser makes the fingerprint.

Last fact-checked: 10 November 2026.

Date the coordination set you rely on

Add the consultants’ drawings you received, your issue register and the transmittal (up to 10 files, or one zip) to one TimeBind.

Make your first TimeBind free → See plans and pricing

Your first Pooled TimeBind is free, with no credit card required. After that, TimeBinds start from US$5, and an ASAP TimeBind is US$15. Your browser makes the fingerprint and the file stays on your device. A TimeBind shows a file existed no later than the recorded time. It doesn’t show who made it.