Shop drawings (the contractor’s or fabricator’s detailed drawings of steelwork, joinery, façades, precast and similar items) usually go through several rounds of submission, comment and resubmission before approval. Keep every submitted revision, the reviewer’s marked-up set, the approval stamp and the transmittal, and timestamp the approved set before fabrication starts. A TimeBind shows that those exact files existed no later than the recorded time and still match their fingerprints. It doesn’t show that the drawings are correct or that anyone is responsible for an error. Your contract decides that. This is general information, not legal advice.
Click here to start: your first TimeBind is free →
Free plan, no credit card needed. Your file stays on your device. More for architects: architecture timestamping guides.
Table of Contents
Why the approved version matters
When something doesn’t fit on site, the questions come quickly: which revision was approved, who stamped it, and did the fabricator build from it? File dates on shared drives and email attachments don’t settle that, because they change when files are copied, renamed or re-exported. A dated record of the approved set shows what the team was working from.
What to keep for each shop drawing package
- Each submitted revision (Rev A, Rev B and so on) exactly as received.
- The reviewer’s comments or marked-up PDF for each round.
- The approval stamp, such as “approved”, “approved as noted” or “revise and resubmit”, with the reviewer’s name and date.
- The transmittal or email that carried each submission and each response.
- The register that lists package, revision, date submitted, date returned and status.
- The fabricator’s confirmation that fabrication will follow the approved revision, if they give one.
A routine for each package
- Log it. Add each submission to the register on the day it arrives.
- Save the reviewed set as a separate file, with the reviewer’s initials and date in the file name.
- When a package is approved, save the final stamped PDF and the register page.
- Timestamp. Put the stamped set, the last round of comments and the transmittal in one TimeBind (up to 10 files). See how to timestamp a file.
- Keep the Proof of Time Certificate in the package folder.
- Treat later changes as new revisions with their own review and timestamp.
Your browser makes the fingerprint and the files stay on your device, which suits fabrication details that are commercially sensitive.
Where this fits on a project
Shop drawings sit between the design drawings and the as-built set. See timestamp Revit and BIM versions before issue for design issue records, and architectural design timestamping for the design stage. For records across a whole job, see construction contract timestamping and how document timestamping resolved a construction dispute. For drawing files, see prove an AutoCAD DWG existed before a date. For firms, see timestamping for design and engineering firms.
What a timestamp doesn’t do
It doesn’t make a drawing right or decide who must fix a problem. It also doesn’t replace your document control system. It adds a dated record outside your own server that shows what the approved set contained.
Frequently Asked Questions
-
Should I timestamp every shop drawing revision?
You don’t have to. At minimum, timestamp the approved set and the last round of comments. For high-risk packages, timestamp each submission.
-
Does approval of a shop drawing transfer responsibility?
That depends on the contract and the stamp wording, such as “approved as noted”. Check your agreement and ask a lawyer about your case.
-
Can I timestamp a very large package?
Yes. Zip the files and timestamp the zip with the transmittal. A TimeBind holds up to 10 files.
-
Does a timestamp show who approved the drawing?
No. The stamp and transmittal show that. A timestamp shows the exact files existed no later than the recorded time and still match their fingerprints.
-
What does a TimeBind cost?
Your first Pooled TimeBind is free, with no credit card required. After that, Pooled TimeBinds start from US$5, and an ASAP TimeBind is US$15. See plans and pricing
Record what was approved
Free to start. The files stay on your device and your browser makes the fingerprint.
Last fact-checked: 10 November 2026.
Date the approved set before fabrication starts
Add the stamped shop drawings, the review comments and the transmittal (up to 10 files) to one TimeBind.
Make your first TimeBind free → See plans and pricing
Your first Pooled TimeBind is free, with no credit card required. After that, TimeBinds start from US$5, and an ASAP TimeBind is US$15. Your browser makes the fingerprint and the file stays on your device. A TimeBind shows a file existed no later than the recorded time. It doesn’t show who made it.