As-built drawings show the building as it was actually constructed. At practical completion or handover, the set you issue becomes the reference for future owners, maintenance, alterations and any later defect questions. Record exactly which set you issued: the final drawings, the issue register, the transmittal and any signed-off versions. A TimeBind shows that those exact files existed no later than the recorded time and still match their fingerprints. It doesn’t show the drawings are accurate or complete, and your contract decides who must supply what. This is general information, not legal advice.
Click here to start: your first TimeBind is free →
Free plan, no credit card needed. Your file stays on your device. More for architects: architecture timestamping guides.
Table of Contents
Why the issued set matters
As-built sets often change late in a project, and they’re handed over in several formats. Later, someone may ask which version went to the owner, or whether a change was recorded before handover. Typical questions:
- Did the owner receive the final revision or an earlier one?
- Was a late variation shown on the drawings at handover?
- Which file was the “approved for construction” set and which the “as built”?
- Who issued which set, and when?
A clear record of the issued set answers those without arguments over file dates.
What to include in the record
- The as-built drawings in the format you issue (usually PDF), and the native files (CAD or BIM) if they are part of the handover.
- The issue or revision register that lists each drawing and its revision.
- The transmittal or email that carried the set, with the date and recipients.
- Redlines or marked-up sets from the builder or site supervisor that were used to produce the as-builts.
- Sign-off documents, such as a handover certificate or an acceptance note, if the contract uses them.
- Related manuals or schedules (operation and maintenance information) issued alongside.
A handover routine
- Freeze the set. Export the final drawings and save the native files. Don’t change them after this step.
- Zip the set if there are many files, or keep to up to 10 files per TimeBind. Include the issue register and the transmittal draft.
- Timestamp. See how to timestamp a file. Your browser makes the fingerprint and the files stay on your device.
- Issue the set and keep the sent message and certificate with the project file.
- Record later revisions as new sets, with their own timestamp. Don’t overwrite the handed-over set.
Where this fits in a project
- Before issue: keep dated records of model versions. See timestamp Revit and BIM versions before issue.
- Before approvals: see planning and DA submission drawings.
- At tender: see tender and bid timestamping.
- For contracts: see construction contract timestamping and how document timestamping resolved a construction dispute.
- For firms: see timestamping for design and engineering firms.
What a timestamp doesn’t do
It doesn’t show that the as-builts match the building, that a drawing is correct or complete, or who was responsible for a defect. Those depend on your site records and contract. It records which files existed by a certain time.
Frequently Asked Questions
-
What are as-built drawings?
Drawings that show a building as constructed, including changes made during construction. They’re usually handed over at or near practical completion.
-
Should I timestamp the PDF set or the native files?
The set you issue is the key one. If you also hand over native CAD or BIM files, include them or a zip of them.
-
Can I timestamp a very large drawing set?
Yes. Put the files in a zip archive and timestamp the archive with the issue register. A TimeBind holds up to 10 files.
-
Does a timestamp prove the as-builts are accurate?
No. It shows that the exact files existed no later than the recorded time and still match their fingerprints. Accuracy depends on your site records.
-
What does a TimeBind cost?
Your first Pooled TimeBind is free, with no credit card required. After that, Pooled TimeBinds start from US$5, and an ASAP TimeBind is US$15. See plans and pricing
Record exactly what you handed over
Free to start. The files stay on your device and your browser makes the fingerprint.
Last fact-checked: 10 November 2026.
Date the handover set
Add the as-built PDFs, the issue register and the transmittal (up to 10 files, or one zip) to one TimeBind before you issue them.
Make your first TimeBind free → See plans and pricing
Your first Pooled TimeBind is free, with no credit card required. After that, TimeBinds start from US$5, and an ASAP TimeBind is US$15. Your browser makes the fingerprint and the file stays on your device. A TimeBind shows a file existed no later than the recorded time. It doesn’t show who made it.







