Answer: shop drawings (construction)

What is a shop drawingA contractor or fabricator’s detailed drawing of how part of the work will be made and installed

TimeBinder adds a layer of protection against AI and human fraud and disputes.

The file stays on your device. Your browser makes a digital fingerprint of the file. TimeBinder records the fingerprint and the time, not the file.

Click here to start: your first TimeBind is free →
Free plan, no credit card needed. Your file stays on your device. More architecture guides.

Short answer

A shop drawing is a detailed drawing prepared by a contractor, subcontractor or supplier showing how part of the work will be fabricated, assembled and installed, based on the design documents. It is submitted for review. In US federal contracts, approval of a shop drawing does not relieve the contractor of responsibility for errors in it.

The definition

The US Federal Acquisition Regulation clause 52.236-21, used in federal construction contracts, defines shop drawings as drawings submitted by the contractor, a subcontractor or any lower-tier subcontractor showing in detail the proposed fabrication and assembly of structural elements and the installation, meaning fit and attachment details, of materials or equipment. It includes diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data and similar material explaining specific portions of the work (FAR 52.236-21).

The same clause sets out review. The contractor must coordinate and check shop drawings for accuracy, completeness and compliance and mark its approval on them; the contracting officer approves or disapproves and gives reasons; work done before approval is at the contractor’s risk; and approval does not relieve the contractor of responsibility for errors or omissions in the drawings. That is a federal clause, and private contracts set their own terms, but the division is common: construction drawings show the design intent prepared by the architect and engineers, shop drawings show how a trade will build a part of it, and as-built drawings show what was actually installed. If you review submittals as the architect, check what your contract says the review covers.

Where a fingerprint fits

Shop drawings go round in cycles: submitted, returned with comments, resubmitted, approved. A later question is often which revision was reviewed and what comments were on it.

A TimeBind records a SHA-256 fingerprint of the exact file and a time, anchored to Bitcoin. The fingerprint is made in your browser and the file is not uploaded. Sealing each submittal as received and each marked-up return as issued gives a checkable record that those exact files existed by a recorded time and have not changed since. It does not approve a submittal, does not define what was reviewed and does not show who prepared the drawing. A TimeBind shows a file existed by a recorded time and has not changed since. It is not legal advice and does not by itself show who made the file, whether it is accurate or whether the work met the standard of care. Related: what is a transmittal and recording which revision was signed off.

Make a TimeBind: first one free →

First Pooled TimeBind free, no card, then from US$5. An ASAP TimeBind is US$15.

Frequently asked questions

Who prepares shop drawings?

The contractor, a subcontractor or a supplier or fabricator. FAR 52.236-21 describes them as submitted by the contractor or any tier of subcontractor.

What is the difference between shop drawings and construction drawings?

Construction drawings show the design prepared by the architect and engineers. Shop drawings show how a trade will fabricate and install part of that design.

Does approving a shop drawing make the architect responsible for it?

That depends on the contract. Under FAR 52.236-21, approval does not relieve the contractor of responsibility for errors or omissions. Review scope is usually set in the contract.

Can a TimeBind approve or check a shop drawing?

No. It records a dated fingerprint of a file and says nothing about whether the drawing is correct.

Record a fingerprint of the file you rely on

Add a layer of protection against AI and human fraud and disputes: a dated, checkable record of the exact file you hold.

  1. Open the app and sign in with email or Google.
  2. Add your files. They stay on your computer.
  3. Seal them and download your Proof of Time certificates.
Open TimeBinder →

First Pooled TimeBind free, no card, then from US$5. See pricing.