Answer: closeout drawings
As-built vs record drawingsAs-builts are the contractor’s marked-up field record; record drawings are the architect’s compiled set
TimeBinder adds a layer of protection against AI and human fraud and disputes.
The file stays on your device. Your browser makes a digital fingerprint of the file. TimeBinder records the fingerprint and the time, not the file.
Click here to start: your first TimeBind is free →
Free plan, no credit card needed. Your file stays on your device. More architecture guides.
Short answer
As-built drawings are prepared by the contractor during construction to show what was actually installed and how it differs from the contract documents. Record drawings are usually prepared by the architect or engineer, when engaged to, by compiling the original drawings, known site changes and the contractor’s as-built information. Some contracts use the terms interchangeably.
The difference
A joint best-practice statement by the Ontario Association of Architects and the Ontario General Contractors Association (21 October 2010) says the terms are often confused. As-built drawings are prepared by the contractor as it builds, documenting the actual locations of building components and changes to the original contract documents, and should record field information about concealed conditions. Record drawings are prepared by the architect when contracted to do so, and are usually a compendium of the original drawings, site changes known to the architect and information from the contractor’s as-builts. It treats measured drawings, made from on-site measurements of an existing building, as a third thing (OAA/OGCA statement).
Owners’ specifications follow the same split. The University of Southern California’s Section 01 78 39 lists as-built drawings, specifications and shop drawings as provided by the contractor at substantial completion, and record drawings as provided by the architect or engineer within 30 days after; it requires the contractor to post changes as they occur rather than at the end, to identify and date each as-built drawing, and to note change order and request for information numbers where applicable (USC Section 01 78 39). The OAA/OGCA statement advises architects to agree the scope and fee for record drawings in the appointment, to state on the drawings that information transferred from the contractor’s as-builts is relied on rather than verified, and to address the client’s use of them and the architect’s copyright. Contracts differ, so check yours.
Where a fingerprint fits
Closeout sets change hands several times: contractor markups to the architect, a compiled record set to the owner, and later copies for maintenance or alterations. Knowing which version each party had at handover can matter years later.
A TimeBind records a SHA-256 fingerprint of the exact file and a time, anchored to Bitcoin. The fingerprint is made in your browser and the file is not uploaded. Sealing the as-built markups when received and the record set when issued gives a checkable record that those exact files existed by a recorded time and have not changed since. It does not show that the drawings match what was built, does not verify the contractor’s information and does not show who drew them. A TimeBind shows a file existed by a recorded time and has not changed since. It is not legal advice and does not by itself show who made the file, whether it is accurate or whether the work met the standard of care. Related: what is a transmittal and what is a shop drawing.
First Pooled TimeBind free, no card, then from US$5. An ASAP TimeBind is US$15.
Frequently asked questions
Who is responsible for as-built drawings?
Usually the contractor, who records field changes and concealed conditions during construction. The contract may set a format and accuracy.
Do architects have to provide record drawings?
Only if engaged to. The OAA/OGCA statement treats record drawings as an additional service to agree in the appointment.
Are record drawings a guarantee of what was built?
No. The OAA/OGCA statement recommends a note that information from the contractor’s as-builts is relied on and not verified by the architect.
Can a TimeBind show my drawings are accurate?
No. It records a dated fingerprint of a file. It shows the file has not changed, not that its content is correct.
Sources
- Ontario Association of Architects and Ontario General Contractors Association, Joint Best Practice Statement: As-Built and Record Drawings, 21 October 2010.
- University of Southern California, Section 01 78 39, Project Record Documents (rev. 18 May 2016).
Record a fingerprint of the file you rely on
Add a layer of protection against AI and human fraud and disputes: a dated, checkable record of the exact file you hold.
- Open the app and sign in with email or Google.
- Add your files. They stay on your computer.
- Seal them and download your Proof of Time certificates.
First Pooled TimeBind free, no card, then from US$5. See pricing.